Wooden Three-Storey Dollhouse with Furniture, Assembly Kit

Dolls & dollhouses

Wooden Three-Storey Dollhouse with Furniture, Assembly Kit

from €143.72 per piece, net, at the factory MOQ

Wooden dollhouse for pretend play: three floors with a staircase, pink wallpaper and interiors, a set of doll furniture (12 pieces per photos). Supplied as a DIY assembly kit, main material wood and MDF per supplier, packed in a colour box.

  • MOQ 2 pcsminimum order (factory MOQ)
  • Branding on requestlogo, colours, packaging
  • GPSR label & EU docswe act as EU importer
  • 8–12 weeks to your doorrail/sea; air on request

Indicative “from” price per piece, excl. VAT, freight and duty. Your delivered price depends on quantity, branding and destination — written offer within 2 working days.

Specifications

TypeDollhouse
Set3-storey house, furniture (12 pcs per photos)
MaterialWood, MDF (per supplier)
FeaturesDIY assembly
PackingColour box
Age8+ (per supplier)
Package / weight45 × 35 × 10 cm / 2 kg

Data from the manufacturer. Sizes, colours and materials can be adjusted for orders above the MOQ.

How to order this product

Ask for a price

Tell us the quantity, colours and destination country. Offer within 2 working days.

Get a sample

We send a sample to your address in 7–14 days. The cost is credited against the order.

Production and QC

The factory produces in 25–45 days; we inspect the goods before they leave the factory.

Delivery

Rail or sea to Poland in 25–45 days, customs cleared, then to your warehouse.

Frequently asked questions

What is the minimum order for the Wooden Three-Storey Dollhouse with Furniture, Assembly Kit?

The factory minimum is 2 pcs. For orders with your own logo or packaging the minimum is usually higher — we confirm it in the offer.

Can I get it with my own logo?

Most products can carry a logo on the product, the label or the packaging. We check the options with the factory and show you a mock-up before production.

Is it compliant for sale in the EU?

We import as an EU company, prepare GPSR labelling with the responsible person and product safety information, and order tests where the material requires it.

How long does delivery take?

Usually 8–12 weeks from order to your warehouse by rail or sea: 25–45 days production plus 25–45 days transport. Air freight takes 7–12 days after production.

Request a price for this product

Quantity, colours and delivery country are enough for a first offer. Add your logo if you want it branded.

  • Reply on working days, usually within a few hours
  • Prices delivered to your door, customs and VAT included in the calculation
  • Written offer within 2 working days
Prefer email? corp@kidiq.eu WhatsApp
Attach files Product list, photos, logo — XLSX, CSV, PDF, PNG, JPG, ZIP, up to 10 MB each